Award of contract for EPC Contract for Solar Field of Qinghai Delingha Concentrated Solar Thermal Power Project, Loan No.:3075-PRC, bid number: 0706-15200002J016.
The project mentioned above had completed bid evaluation and the BER was sent to ADB for review, ADB confirms no objection to the Bid Evaluation Committee’s recommendation of awarding the contract to JV of Beijing Shouhang IHW Resources Saving Technology Co., Ltd & Shandong Electric Power Construction No.2 Company
The results and relevant information are as below.
1. The following five (5) bids were received by the closing deadline and were publicly opened and read. And their technical bids were evaluated. The names of bidder whose bids were rejected and the reasons for their rejection are shown below.
Bidders
|
No.
|
Name
|
Nationality
|
1
|
JV of No.703 Research Institute of China Shipbuilding Industry Corporation(CSIC) and SEPCO1 Electric Power Construction Corporation
|
The People’s Republic of China
|
2
|
Northwest Electric Power Design Institute Co., Ltd of China Power Engineering Consulting Group
|
The People’s Republic of China
|
3
|
China Energy Engineering Group Shanxi Electric Power Engineering Co., Ltd.
|
The People’s Republic of China
|
4
|
JV of Beijing Shouhang IHW Resources Saving Technology Co., Ltd & Shandong Electric Power Construction No.2 Company
|
The People’s Republic of China
|
5
|
North China Power Engineering Co., Ltd. of China Power Engineering Consulting Group
|
The People’s Republic of China
|
Bidder No. 3 (China Energy Engineering Group Shanxi Electric Power Engineering Co., Ltd.) was considered not qualified as it did not comply with qualification requirements. Bidder No. 5 (North China Power Engineering Co., Ltd. of China Power Engineering Consulting Group) was considered not qualified as it did not comply with major commercial terms and conditions. Their price proposals were returned unopened.
2. The technical proposals submitted by the following three (3) bidders were considered responsive to the requirements of the bidding documents, and their price proposals were publicly opened and read. The names of those bidders and their bid prices are shown below.
Bidder No.
|
Name of Bidders
|
Bid Price at opening
|
|
Foreign Currency
|
Local Currency
|
|
1
|
JV of No.703 Research Institute of China Shipbuilding Industry Corporation(CSIC) and SEPCO1 Electric Power Construction Corporation
|
EUR30,138,382.87 + USD1,085,525.80
|
RMB449,542,286.24
|
|
|
2
|
Northwest Electric Power Design Institute Co., Ltd of China Power Engineering Consulting Group
|
EUR29,476,867.00
|
RMB583,480,977.00
|
|
|
4
|
JV of Beijing Shouhang IHW Resources Saving Technology Co., Ltd & Shandong Electric Power Construction No.2 Company
|
EUR29,817,105.20
|
RMB355,130,453.90
|
|
|
3. Names and evaluated prices of each bid that was evaluated are shown below.
Bidder No.
|
Name of Bidders
|
Evaluated Bid Price
|
|
|
1
|
JV of No.703 Research Institute of China Shipbuilding Industry Corporation(CSIC) and SEPCO1 Electric Power Construction Corporation
|
¥589,824,889.91
|
|
|
2
|
Northwest Electric Power Design Institute Co., Ltd of China Power Engineering Consulting Group
|
¥702,767,884.47
|
|
|
4
|
JV of Beijing Shouhang IHW Resources Saving Technology Co., Ltd & Shandong Electric Power Construction No.2 Company
|
¥566,754,376.35
|
|
|
Date for Determining Applicable Exchange Rates:4 January 2016(Date of opening of price proposals)
1 US$=6.5225RMB
1 EUR=7.0974RMB
Source: The selling exchange rates of Bank of China
4. Name of the winning bidder, and the price it offered, as well as the summary scope and duration of the contract awarded are shown below.
Name of the winning Bidder
|
JV of Beijing Shouhang IHW Resources Saving Technology Co., Ltd
& Shandong Electric Power Construction No.2 Company
|
|
|
Price
|
EUR 29,817,105.20 and CNY 355,130,453.90 plus CNY 77,601,213.49
of taxes and duties
|
|
|
|
Scope& Duration
|
The construction and completion of solar field EPC for Qinghai Delingha Concentrated Solar Thermal Power Project
The total construction duration is 330 days.
|
|
|
Unsuccessful bidders may request in writing to the tendering agent CNTIC for a debriefing seeking explanations, which shall be sent within 3 days from the date of publication of contract award if any. Requests sent beyond the aforementioned period will not be accepted.
China National Technical Imp.& Exp. Corporation