• 公海彩船6600(中国)官方网站

    CORREN POSITION: HOME1 > NEWS CENTER > News

    Generator of CNTIC Bangladesh Ashuganj Power Plant (East) Project Successfully Located

    Source: Author: Date:2020-02-25【Font:B M S


    At 9:43 am local time on February 24th, the generator of Bangladesh Ashuganj Power Plant (East) Project undertaken by CNTIC was successfully hoisted. With a total weight of 408 tons, the generator is yet the heaviest single equipment in the entire plant.

    友情链接: