The hoisting of the first main bow of the boiler installed in the Ardy Para Power Plant of CNTIC in Indonesia was in place on July 28, which marked the formal commencement of large-sized hoisting operation of the boiler, and it also established a foundation for the consequential hoisting operation of heating surface.