The third examinational committee of construction drawing design for Adipala power plant project of Indonesia ended successfully in Zhejiang Electric Power Design Institute on July 13th. Shan Wei, vice president of CNTIC, was present at the examinational committee. In this conference, the approval rate of level A, I is up to 99.5% and passing rate of examination is 100%, which effectively ensure the civil construction and material purchase at the project site.