公海彩船6600(中国)官方网站

CORREN POSITION: HOME1 > NEWS CENTER > News

HOLD-POINT INSPECTION OF CW PUMP OF PLTU 2 JATENG 1X660MW ADIPALA COMPLETED

Source: Author: Date:2011-11-09【Font:B M S

On November 5, the CW pump hold-point inspection of CNTIC PLTU 2 JATENG 1X660MW ADIPALA was finished successfully in Changsha, China. Relevant personnel from PLN, CNTIC and related supervision have witnessed the inspection which was conducted under strict supervision and formed witness documentation. The inspection is a prelude of all the equipment H-point inspections of the project.

友情链接: