Boiler foundation of PLTU 1 BANTEN SURALAYA UNIT 8 contracted by CNTIC has been delivered to start installing and hoisting the steel structure on March 17, 2008. The diagonal tolerance of foundation bolts reached 1mm (15mm stipulated in the Specification), achieved international top standard in the field of coal-fired power plant construction.