On June 22nd, the last single project of the Sri Lanka South Expressway Project - Landslide Control Engineering was successfully handed over. The Take Over Certificate (TOC) was issued by the owner Sri Lanka Highway Department to CNTIC and the warranty period is until the end of November, 2017.