From September 22th to 25th, Jambi 50 MW Gas Turbine Power Station EPC Project in South Sumatra, Indonesia contracted by CNTIC passed the 72-Hour Reliability Test in only one shot. Later, the Performance Test required by PLN was completed successfully on September 28th and it entered the stage of commercial operation smoothly.