On May 26, 2016, local time at India, the synchronization of Unit-1 of 2×660mw Super Critical Coal Fired Thermal Power Project Contracted by CNTIC achieved at its first try. The 2×660mw Super Critical Coal Fired Thermal Power Project is a quasi supercritical coal fired power plant, which has the highest level of the technical parameter among the export projects that have been put into operation.