公海彩船6600(中国)官方网站

      CORREN POSITION: HOME1 > NEWS CENTER > Picture News

      Unit-1 of Philippines Puting Bato 1x135MW Coal-Fired Power Plant Project Succeeded in Generating at Full Load

      Source: Author: Date:2014-10-16【Font:B M S


      At 10:30 on Oct.16, Unit-1 of Philippines Puting Bato 1x135MW Coal-Fired Power Plant Project contracted by CNTIC generated at the full load achieving 135MW at the first time. The three main equipments runs well with good parameters.

      友情链接: