公海彩船6600(中国)官方网站

    CORREN POSITION: HOME1 > NEWS CENTER > Picture News

    8.12

    Source: Author:12 Date:2009-08-11【Font:B M S

    On December 22, 2008, in Jakarta Convention Center and on the Third Session of Indonesia-China Energy Forum (ICEF), with the co-witness of China’s Vice Premier Li Keqiang and Vice President of Indonesia Jusuf Kalla, the EPC Contract for Indonesia Adipala 1x660MW Supercritical Coal-fired Power Plant was signed successfully. CNTIC General Manager Wang Xusheng as the Contractor’s Representative, PT. PLN President Fahmi as the Owner’s Representative signed the Contract respectively. Deputy General Manager of Genertec Group Zhang Ruen and CNTIC Deputy General Manager Shanwei and Wang Guoying attended the signing ceremony. This Project will be the first supercritical power plant undertaken by a Chinese enterprise acting as EPC Contractor abroad, and the success signing indicated CNTIC’s market development and great achievement in Indonesia power energy area.
    友情链接: