China’s first 9E-CLASS, Heavy-duty Gas Turbine manufactured and assembled by Nanjing Turbine & Electirc Machinery (Group) Co., Ltd (NTC) and GE consortium, was delivered on July 12, 2006 from NTC. The Gas Turbine was procured by Qinghai Geermu Gas Turbine Plant through bundled buy conducted by CNTIC. Mr. Zhang Zhonghua, Vice-President of CNTIC, leading a team, attended the ceremony and cut the ribbon for it.