公海彩船6600(中国)官方网站

CORREN POSITION: HOME1 > NEWS CENTER > Picture News

Genertec CNTIC ships main hoisting equipment to Bosnia and Herzegovina for Ivovik wind power project

Source: Author: Date:2022-08-19【Font:B M S

The 800-ton main hoisting equipment for the Ivovik wind farm, a project undertaken by Genertec CNTIC in Bosnia and Herzegovina, was shipped from Shanghai Port on August 15, 2022. The equipment is expected to arrive at Rijeka Port, Croatia by the end of September and be sent to the project site.

友情链接: